- This event has passed.
LANDMARKS 1 – Chenault Spence, Chair; Susan Gammie, Vice Chair
July 16 @ 6:30 pm - 9:30 pm
Thursday, 7/16 @ 6:30 PM – In person at 3 Washington Square Village, Conference Room (near the corner of Bleecker and LaGuardia – Map) – Option to Access via Zoom Videoconference
Seating is limited in the Conference Room. Registration is required to ensure there is adequate space.
- *51 Mercer St. (SoHo Cast Iron Historic District) – Application is to replace the door on the ground floor and garage door.
- *427-429 Broadway a/k/a 43- 45 Howard St. (SoHo-Cast Iron Historic District) – Application is to construct a new enclosed egress stair at the rear yard.
- *363 Bleecker St.(Greenwich Village Historic District) – Application is to extend the exiting roof stair bulkhead and add roof safety railings all around the roof.
- *287 Bleecker St. (Greenwich Village Historic District Extension II) – Application is to install a new awning, signage, and reconfigure a window and door at the storefront. (Will be reviewed at staff level)
- *422 W. Broadway (SoHo Cast Iron District) – Application is to construct a rooftop addition, new masonry walls, stair bulkheads, install rooftop mechanical equipment, and restore the existing facade. (LAID OVER)
Business Session
- *244 Waverly Pl. (Greenwich Village Historic District) – Application for revocable consent to install a fenced-in areaway.
- *73 Washington Pl. (Greenwich Village Historic District) – Consideration of a request to extend a permit issued in 2015 in order to complete renovations that are in progress.
To request an opportunity to speak on any agenda item, please complete the form here.
Please visit CB2 Manhattan’s online calendar for agenda updates by clicking here.
Please register to attend in person by clicking here.
Please register to join the Zoom meeting by clicking here.